The property is constructed around a single span steel portal frame structure, providing modern industrial accommodation, incorporating a mezzanine/two storey section to the centre of the unit.
Two unencumbered warehouse sections provide full height accommodation with minimum clearance of 6.2m - 8m
at the apex with suspended LED lighting and solid floors. The centre of these two warehouse sections incorporate a first floor level, previously used for assembly with forklift loading access from ground floor level. A trade counter entrance also provides access to the first floor level where WCs and canteen are located. 3 Phase power is in situ.
Loading is facilitated over a secure shared concrete forecourt, with 4 full height level loading doors. A demised yard provides parking.